![https://www.everettpainting.biz/wp-content/uploads/2012/05/IMGP09971.jpg](https://www.everettpainting.biz/wp-content/uploads/2012/05/IMGP09971.jpg)
These offices were painted back in 2007. The render was is in poor condition and was scraped back, filled and finished in a resin based exterior masonry paint, all wood-work was finished in full Gloss White, this is only a small part of the building and the job took about 4 months to complete, some areas required scaffold while others were accessed using a cherry picker.